IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0065 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,600 $109,700 Not Implemented
TT0065 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,200 $3,700 Not Implemented
TT0065 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $12,200 Implemented
TT0065 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,990 $5,000 Implemented
TT0065 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $9,600 $10,000 Not Implemented
TT0065 # 08 Y:2011 08 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $20,800 $22,000 Not Implemented
TT0065 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $65,500 $61,500 Implemented
WV0426 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,820 $1,000 Implemented
WV0426 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,303 $29,900 Implemented
WV0426 # 03 Y:2011 03 2011 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,561 $4,294 Not Implemented
WV0426 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,594 $458 Implemented
WV0426 # 05 Y:2011 05 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,328 $10,400 Not Implemented
WV0426 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,319 $268 Not Implemented
WV0426 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,208 $905 Not Implemented
WV0426 # 08 Y:2011 08 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,197 $0 Implemented
WV0426 # 09 Y:2011 09 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $739 $785 Not Implemented
WV0426 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $723 $21 Implemented
WV0426 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $538 $1,956 Not Implemented
LE0317 # 01 Y:2011 01 2011 REPLACE BOILER $284,580 $500,000 Implemented
LE0317 # 02 Y:2011 02 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $185,253 $118,000 Implemented
LE0317 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,617 $13,469 Implemented
LE0317 # 04 Y:2011 04 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $28,496 $10,000 Not Implemented
LE0317 # 05 Y:2011 05 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,299 $75,000 Not Implemented
LE0317 # 06 Y:2011 06 2011 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0317 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $12,721 $22,000 Implemented