Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0129 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,343 | $37,000 | n/a |
CW0129 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $951 | $180 | n/a |
CW0129 # 05 Y:2023 | 05 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,872 | $21,000 | n/a |
CW0129 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,398 | $72,618 | n/a |
TT0304 # 01 Y:2023 | 01 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $74,585 | $185,000 | Not Implemented |
TT0304 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $51,075 | $120 | Implemented |
TT0304 # 03 Y:2023 | 03 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $38,784 | $10,000 | Not Implemented |
TT0304 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $12,488 | $40,000 | Not Implemented |
TT0304 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,867 | $5 | Implemented |
TT0304 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $6,857 | $372 | Implemented |
TT0304 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $5,133 | $300 | Implemented |
TT0304 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,000 | $3,000 | Not Implemented |
TT0304 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $544 | $405 | Implemented |
TT0304 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $87 | $50 | Implemented |
UC2313 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $275 | $0 | n/a |
UC2313 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,527 | $1,500 | n/a |
UC2313 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,066 | $3,500 | n/a |
UC2313 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $732 | $428 | n/a |
UC2313 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $873 | $1,300 | n/a |
UC2313 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $251 | $50 | n/a |
UC2313 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,805 | $75 | n/a |
UC2313 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,884 | $16,157 | n/a |
UC2313 # 09 Y:2023 | 09 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $4,673 | $19,488 | n/a |
UC2313 # 10 Y:2023 | 10 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $615 | $1,053 | n/a |
SJ0007 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $128,947 | $765,487 | Not Implemented |