IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0171 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $131,514 $7,800 Not Implemented
MI0171 # 03 Y:2008 03 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $110,098 $168,305 Not Implemented
MI0171 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101,069 $53,922 Not Implemented
MI0171 # 05 Y:2008 05 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $42,003 $860 Not Implemented
MI0171 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,317 $1,210 Not Implemented
IC0144 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,363 $12,122 Not Implemented
IC0144 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,224 $5,101 Implemented
IC0144 # 03 Y:2008 03 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $461 $0 Implemented
IC0144 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $533 $781 Implemented
IC0144 # 05 Y:2008 05 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $68 $0 Implemented
IC0144 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,031 $4,364 Implemented
IC0144 # 07 Y:2008 07 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,002 $2,000 Implemented
IC0144 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $431 $0 Not Implemented
IC0144 # 09 Y:2008 09 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $222 $0 Implemented
IC0144 # 10 Y:2008 10 2008 USE SOLAR HEAT TO HEAT WATER $305 $1,965 Not Implemented
IC0144 # 11 Y:2008 11 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $307 $0 Not Implemented
IC0144 # 12 Y:2008 12 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $48 $0 Implemented
IC0144 # 13 Y:2008 13 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $920 Implemented
GT0853 # 01 Y:2008 01 2008 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,045 $0 Implemented
GT0853 # 02 Y:2008 02 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,512 $0 Not Implemented
GT0853 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,999 $4,500 Implemented
GT0853 # 04 Y:2008 04 2008 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $7,123 $3,000 Implemented
GT0853 # 05 Y:2008 05 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $73,789 $34,472 Not Implemented
GT0853 # 06 Y:2008 06 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,634 $55,500 Not Implemented
GT0853 # 07 Y:2008 07 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,989 $8,200 Not Implemented