IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0345 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,266 $4,307 Not Implemented
SF0345 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,999 $3,759 Implemented
SF0345 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $511 $1,404 Not Implemented
SF0345 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,115 $6,510 Implemented
SF0345 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,339 $4,380 Implemented
SD0396 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,984 $280 Not Implemented
SD0396 # 02 Y:2007 02 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,283 $28,500 Implemented
SD0396 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,115 $200 Not Implemented
SD0396 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,509 $2,200 Implemented
SD0396 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $945 $1,000 Implemented
SD0395 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,816 $8,425 Implemented
SD0395 # 02 Y:2007 02 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,658 $13,350 Not Implemented
SD0395 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,155 $240 Implemented
SD0395 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,081 $1,213 Not Implemented
SD0395 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,878 $3,400 Implemented
SD0395 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $659 $1,146 Not Implemented
UF0401 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,913 $36,935 Not Implemented
UF0401 # 02 Y:2007 02 2007 INSTALL SKYLIGHTS $6,200 $14,564 Not Implemented
UF0401 # 03 Y:2007 03 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,038 $0 Implemented
UF0401 # 04 Y:2007 04 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,673 $2,571 Implemented
UF0401 # 05 Y:2007 05 2007 ELIMINATE A BY-PRODUCT $3,032 $158 Implemented
UF0401 # 06 Y:2007 06 2007 IMPROVE SPACE COMFORT CONDITIONING $13,160 $26,800 Not Implemented
UF0401 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,239 $638 Implemented
UF0401 # 08 Y:2007 08 2007 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,850 $957 Not Implemented
UF0401 # 09 Y:2007 09 2007 INSTALL EQUIPMENT TO MOVE PRODUCT $32,175 $1,260 Not Implemented