IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0377 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $341 $0 Not Implemented
UF0377 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $542 $750 Not Implemented
UF0377 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,507 $13,121 Not Implemented
UF0377 # 07 Y:2006 07 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,877 $21,000 Not Implemented
UF0377 # 08 Y:2006 08 2006 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $626,232 $1,134,871 Not Implemented
UF0377 # 09 Y:2006 09 2006 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $4,718 $463 Not Implemented
UF0377 # 10 Y:2006 10 2006 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,000 $0 Not Implemented
MI0127 # 01 Y:2006 01 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $34,584 $3,984 Not Implemented
MI0127 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,742 $46,506 Not Implemented
MI0127 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,532 $33,405 Implemented
MI0127 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,597 $1,074 Implemented
MI0127 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,247 $30 Not Implemented
MI0127 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,084 $4,800 Implemented
MI0127 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,640 $0 Not Implemented
MI0127 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,107 $3,878 Implemented
WI0513 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $42,840 $1,800 Implemented
WI0513 # 02 Y:2006 02 2006 IMPROVE SPACE COMFORT CONDITIONING $16,286 $2,450 Not Implemented
WI0513 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $10,175 $1,000 Not Implemented
WI0513 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,710 $5,940 Implemented
WI0513 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,821 $640 Not Implemented
WI0513 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,987 $450 Not Implemented
WI0513 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,529 $0 Implemented
WI0513 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,291 $400 Implemented
WI0513 # 09 Y:2006 09 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,277 $200 Implemented
WV0340 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $80,134 $2,500 Implemented