IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0728 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $8,639 $2,100 Implemented
UD0728 # 05 Y:2005 05 2005 REDUCE FLUID FLOW RATES $6,270 $22,000 Implemented
UD0728 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,243 $1,080 Not Implemented
UD0728 # 07 Y:2005 07 2005 REDUCE FLUID FLOW RATES $3,226 $0 Implemented
UD0728 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $2,677 $1,600 Implemented
UD0728 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,237 $0 Implemented
UD0728 # 10 Y:2005 10 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,141 $2,500 Not Implemented
UD0723 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,840 $65,105 Implemented
UD0723 # 02 Y:2005 02 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,430 $0 Implemented
UD0723 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,394 $0 Not Implemented
UD0723 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,315 $13,340 Implemented
UD0723 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,126 $7,000 Implemented
UD0723 # 06 Y:2005 06 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,470 $0 Not Implemented
UD0723 # 07 Y:2005 07 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,573 $0 Implemented
UD0723 # 08 Y:2005 08 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,309 $0 Implemented
UD0723 # 09 Y:2005 09 2005 REDUCE WATER USE WITH COUNTER CURRENT RINSING $3,070 $2,000 Not Implemented
UD0723 # 10 Y:2005 10 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,730 $0 Not Implemented
UD0723 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $2,650 $2,629 Implemented
UD0723 # 12 Y:2005 12 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,164 $0 Implemented
UD0723 # 13 Y:2005 13 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,423 $500 Not Implemented
UD0723 # 14 Y:2005 14 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $840 $0 Not Implemented
UD0723 # 15 Y:2005 15 2005 UPGRADE CONTROLS ON COMPRESSORS $522 $0 Implemented
WV0319 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $7,154 $535 Implemented
WV0319 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,038 $1,300 Not Implemented
WV0319 # 03 Y:2005 03 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,621 $4,400 Implemented