Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0478 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,285 | $1,000 | Not Implemented |
WI0478 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,814 | $23,430 | n/a |
WI0478 # 07 Y:2004 | 07 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,125 | $2,500 | Not Implemented |
WI0478 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $2,183 | $1,200 | Implemented |
TA0081 # 01 Y:2004 | 01 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,080 | $31,600 | Not Implemented |
TA0081 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,775 | $0 | Implemented |
TA0081 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,360 | $0 | Implemented |
TA0081 # 04 Y:2004 | 04 | 2004 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $11,120 | $2,795 | Not Implemented |
TA0081 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $40 | Implemented |
TA0081 # 06 Y:2004 | 06 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,255 | $190 | Not Implemented |
TA0081 # 07 Y:2004 | 07 | 2004 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,035 | $0 | Implemented |
TA0081 # 08 Y:2004 | 08 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,880 | $0 | Not Implemented |
UM0265 # 01 Y:2004 | 01 | 2004 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $105,689 | $64,000 | n/a |
UM0265 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,525 | $30,000 | n/a |
UM0265 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,733 | $15,532 | n/a |
UM0265 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $11,886 | $30,000 | n/a |
UM0265 # 05 Y:2004 | 05 | 2004 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $6,581 | $10,000 | n/a |
UM0265 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,069 | $975 | Not Implemented |
UM0265 # 07 Y:2004 | 07 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,652 | $250 | Not Implemented |
UM0265 # 08 Y:2004 | 08 | 2004 | COVER OPEN TANKS | $855 | $1,500 | Not Implemented |
UM0264 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,250 | $2,600 | Implemented |
UM0264 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,340 | $12,530 | n/a |
UM0264 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $7,700 | $800 | Not Implemented |
UM0264 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,653 | $9,433 | Not Implemented |
UM0264 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $2,270 | $5,610 | Not Implemented |