IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,054

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0653 # 12 Y:2023 12 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,538 $21,440 Not Implemented
WV0653 # 11 Y:2023 11 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,758 $2,675 Implemented
WV0653 # 10 Y:2023 10 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,884 $14,800 Implemented
WV0653 # 09 Y:2023 09 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,240 $12,390 Not Implemented
WV0653 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $10,683 $9,567 Implemented
WV0653 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,961 $800 Implemented
WV0653 # 06 Y:2023 06 2023 MINIMIZE WATER USAGE $13,630 $45,516 Implemented
WV0653 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $27,203 $93,600 Not Implemented
WV0653 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $33,555 $52,800 Implemented
WV0653 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $38,158 $64,250 Implemented
WV0653 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,512 $82,920 Not Implemented
WV0653 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $75,356 $210,000 Not Implemented
UD1055 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,617 $4,189 Not Implemented
UD1055 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $13,546 $36,036 Not Implemented
UD1055 # 09 Y:2023 09 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,276 $296 Not Implemented
UD1055 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $2,835 Not Implemented
UD1055 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $4,478 $2,800 Not Implemented
UD1055 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $499 $675 Not Implemented
UD1055 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $716 $0 Implemented
UD1055 # 03 Y:2023 03 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $4,980 $600 Not Implemented
UD1055 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,342 $952 Not Implemented
UD1055 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $109,446 $0 Not Implemented
UD1054 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $74 $0 Not Implemented
UD1054 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,248 $500 Implemented
UD1054 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $0 Not Implemented