Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
238
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0304 # 03 Y:2023 | 03 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $38,784 | $10,000 | Not Implemented |
TT0304 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $51,075 | $120 | Implemented |
TT0304 # 01 Y:2023 | 01 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $74,585 | $185,000 | Not Implemented |
TT0287 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,887 | $113 | n/a |
TT0287 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,724 | $60 | n/a |
TT0287 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,633 | $1,785 | n/a |
TT0287 # 03 Y:2023 | 03 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,858 | $7,500 | n/a |
TT0287 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,231 | $3,100 | n/a |
TT0287 # 05 Y:2023 | 05 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,905 | $1,050 | n/a |
TT0287 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,202 | $21,100 | n/a |
TT0287 # 08 Y:2023 | 08 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,558 | $3,750 | n/a |
TT0287 # 09 Y:2023 | 09 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,170 | $7,500 | n/a |
TT0287 # 10 Y:2023 | 10 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,966 | $6,750 | n/a |
TT0287 # 11 Y:2023 | 11 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,643 | $100 | n/a |
TT0287 # 12 Y:2023 | 12 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $907 | $2,724 | n/a |
TT0262 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,405 | $1,640 | Not Implemented |
TT0262 # 01 Y:2021 | 01 | 2021 | USE SOLAR HEAT FOR HEAT | $44,686 | $476,000 | Not Implemented |
TT0262 # 02 Y:2021 | 02 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,441 | $15,000 | Not Implemented |
TT0262 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $4,646 | $3,879 | Implemented |
TT0262 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,023 | $2,762 | Implemented |
TT0256 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,866 | $29,886 | Not Implemented |
TT0256 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $825 | $3,000 | Not Implemented |
TT0256 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,560 | $150 | Not Implemented |
TT0256 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,816 | $5,000 | Not Implemented |
TT0256 # 02 Y:2021 | 02 | 2021 | METER WASTE WATER | $10,722 | $2,150 | Not Implemented |