Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2305 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $6 | $0 | Implemented |
UC2305 # 02 Y:2023 | 02 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,483 | $0 | Implemented |
UC2305 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,923 | $0 | Implemented |
UC2305 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $9,833 | $0 | Implemented |
UC2305 # 05 Y:2023 | 05 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $13,136 | $111,775 | Not Implemented |
UC2305 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $414 | $300 | Implemented |
UC2305 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $510 | $1,300 | Implemented |
UC2305 # 08 Y:2023 | 08 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $173 | $30 | Not Implemented |
UC2305 # 09 Y:2023 | 09 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,885 | $28,876 | Implemented |
UC2305 # 10 Y:2023 | 10 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $25,926 | $115,275 | Not Implemented |
UC2305 # 11 Y:2023 | 11 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,248 | $43,351 | Not Implemented |
UC2305 # 12 Y:2023 | 12 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,010 | $126,560 | Not Implemented |
IP0173 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,485 | $0 | Not Implemented |
IP0173 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,055 | $0 | Not Implemented |
IP0173 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,365 | $840 | Not Implemented |
IP0173 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,684 | $61,320 | Not Implemented |
IP0173 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $399 | $1,042 | Not Implemented |
IP0173 # 06 Y:2023 | 06 | 2023 | OPTIMIZE PLANT POWER FACTOR | $6,837 | $33,000 | Not Implemented |
UF0594 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,918 | $289,896 | Not Implemented |
UF0594 # 02 Y:2023 | 02 | 2023 | RECOVER MECHANICAL ENERGY | $19,952 | $159 | Not Implemented |
UF0594 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $17,069 | $9,630 | Not Implemented |
UF0594 # 04 Y:2023 | 04 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $15,924 | $16,616 | Not Implemented |
UF0594 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,320 | $18,243 | Not Implemented |
UF0594 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,148 | $25,265 | Not Implemented |
UF0594 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,181 | $6,536 | Implemented |