IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0066 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $5,571 $8,423 n/a
IC0066 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,454 $19,501 n/a
IC0066 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,576 $2,920 n/a
IC0066 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $43,869 $12,078 n/a
IC0066 # 05 Y:2003 05 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,337 $39,718 n/a
IC0066 # 06 Y:2003 06 2003 INSTALL SET-BACK TIMERS $98,862 $75,187 n/a
IC0066 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,972 $3,710 n/a
IC0066 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,849 $14,148 n/a
IC0066 # 09 Y:2003 09 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,071 $78,893 n/a
WV0279 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,327 $15,420 Implemented
WV0279 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,812 $20,095 Implemented
WV0279 # 03 Y:2003 03 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $11,747 $700 Implemented
WV0279 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $9,443 $2,540 Implemented
WV0279 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,983 $165 Not Implemented
WV0279 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,685 $510 Implemented
WV0279 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $4,123 $2,300 Implemented
WV0279 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,474 $1,400 Not Implemented
WV0279 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,083 $70 Not Implemented
WV0279 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $135 Not Implemented
WV0279 # 11 Y:2003 11 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $260 Not Implemented
BD0238 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,787 $24,780 Implemented
BD0238 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,453 $500 Implemented
BD0238 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $1,978 $1,650 Implemented
BD0238 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,134 $370 Implemented
BD0238 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $3,285 Implemented