IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0179 # 08 Y:2020 08 2020 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $65,500 $47,500 Not Implemented
DL0178 # 01 Y:2020 01 2020 RECOVER AND REUSE COOLING WATER $13,590 $4,000 Not Implemented
DL0178 # 02 Y:2020 02 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $470 $750 Not Implemented
DL0178 # 03 Y:2020 03 2020 INSTALL TIMERS AND/OR THERMOSTATS $640 $60 Not Implemented
DL0178 # 04 Y:2020 04 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,880 $10,000 Not Implemented
DL0178 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $910 $1,000 Not Implemented
DL0178 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,720 $2,500 Not Implemented
DL0178 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,900 $2,750 Not Implemented
DL0139 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,375 $19,745 Not Implemented
DL0139 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $11,510 $2,330 Not Implemented
DL0139 # 03 Y:2015 03 2015 USE HEAT PUMP FOR SPACE CONDITIONING $4,240 $9,280 Not Implemented
DL0139 # 04 Y:2015 04 2015 REDUCE VENTILATION AIR $850 $0 Not Implemented
DL0139 # 05 Y:2015 05 2015 INSTALL TIMERS AND/OR THERMOSTATS $6,100 $710 Not Implemented
DL0139 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,120 $0 Not Implemented
DL0139 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $320 $710 Not Implemented
DL0139 # 08 Y:2015 08 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $320 $90 Not Implemented
DL0139 # 09 Y:2015 09 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $810 $700 Not Implemented
DL0139 # 10 Y:2015 10 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,040 $22,500 Not Implemented
DL0132 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,820 $17,500 Not Implemented
DL0132 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,480 $1,375 Implemented
DL0132 # 03 Y:2014 03 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,657 $2,600 Not Implemented
DL0132 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $11,450 $1,000 Implemented
DL0132 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,000 $3,000 Not Implemented
DL0132 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,800 $4,000 Not Implemented
DL0132 # 07 Y:2014 07 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,920 $1,000 Implemented