Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0158 # 11 Y:2022 | 11 | 2022 | USE OPTIMUM TEMPERATURE | $837 | $763 | Not Implemented |
IP0158 # 12 Y:2022 | 12 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,116 | $8,000 | Implemented |
IP0158 # 13 Y:2022 | 13 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $419 | $1,159 | Implemented |
IP0158 # 14 Y:2022 | 14 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,629 | $9,543 | Implemented |
UD1041 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,355 | $0 | Not Implemented |
UD1041 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,327 | $0 | Not Implemented |
UD1041 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,960 | $604 | Not Implemented |
UD1041 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,702 | $0 | Not Implemented |
UD1041 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,148 | $18,523 | Not Implemented |
UD1041 # 06 Y:2022 | 06 | 2022 | REDUCE VENTILATION AIR | $26,031 | $45,000 | Not Implemented |
UD1039 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $306 | $202 | Not Implemented |
UD1039 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $5,000 | Not Implemented |
UD1039 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $875 | $316 | Not Implemented |
UD1039 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,654 | $50 | Not Implemented |
UD1039 # 07 Y:2022 | 07 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,304 | $2,369 | Not Implemented |
UD1039 # 01 Y:2022 | 01 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $55 | $0 | Not Implemented |
UD1039 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $1,123 | $714 | Not Implemented |
UA0257 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89,160 | $80,028 | Implemented |
UA0257 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,505 | $1,000 | Implemented |
UA0257 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,741 | $8,591 | Implemented |
UA0257 # 04 Y:2022 | 04 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,731 | $150 | Implemented |
UA0257 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,573 | $5,533 | Not Implemented |
MI0406 # 01 Y:2022 | 01 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $17,298 | $45,090 | Implemented |
MI0406 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,075 | $5,674 | Implemented |
MI0406 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,550 | $2,031 | Implemented |