Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0406 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,468 | $15,450 | Implemented |
MI0406 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $5,579 | $15,821 | Implemented |
MI0406 # 06 Y:2022 | 06 | 2022 | ELIMINATE/REDUCE AN OPERATION | $4,770 | $960 | Implemented |
MI0406 # 07 Y:2022 | 07 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,016 | $100 | Not Implemented |
AS0518 # 01 Y:2022 | 01 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,267 | $226,584 | Not Implemented |
AS0518 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $22,746 | $3,707 | Not Implemented |
AS0518 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $21,371 | $9,286 | Not Implemented |
AS0518 # 04 Y:2022 | 04 | 2022 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $16,536 | $3,537 | Not Implemented |
AS0518 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,420 | $3,762 | Not Implemented |
AS0518 # 06 Y:2022 | 06 | 2022 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $391 | $1,619 | Not Implemented |
SF0583 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,948 | $240 | Implemented |
SF0583 # 02 Y:2022 | 02 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,046 | $2,379 | Implemented |
SF0583 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,018 | $13,272 | Not Implemented |
SF0583 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,208 | $6,293 | Not Implemented |
SF0583 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,181 | $30,438 | Implemented |
UD1036 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,141 | $0 | Not Implemented |
UD1036 # 02 Y:2022 | 02 | 2022 | COMBINE UTILITY METERS | $309 | $0 | Not Implemented |
UD1036 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,661 | $250 | Not Implemented |
UD1036 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,150 | $0 | Not Implemented |
UD1036 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,379 | $316 | Not Implemented |
UD1036 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,062 | $0 | Not Implemented |
UD1036 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,509 | $20,000 | Not Implemented |
UD1036 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,417 | $0 | Not Implemented |
UD1036 # 09 Y:2022 | 09 | 2022 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $40,334 | $63,686 | Not Implemented |
UD1036 # 10 Y:2022 | 10 | 2022 | INSTALL OCCUPANCY SENSORS | $1,706 | $3,200 | Not Implemented |