IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

680

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0683 # 01 Y:2003 01 2003 $30,335 $50,000 Not Implemented
UD0683 # 06 Y:2003 06 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $200 $0 Not Implemented
UD0683 # 05 Y:2003 05 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $0 Not Implemented
UD0683 # 04 Y:2003 04 2003 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,225 $0 Not Implemented
UD0683 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,600 $4,625 Not Implemented
MI0068 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $8,099 $169 Not Implemented
MI0068 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $291 $29 Implemented
MI0068 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $131 $155 Not Implemented
MI0068 # 02 Y:2003 02 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,426 $285 Not Implemented
MI0068 # 01 Y:2003 01 2003 $2,625 $80 Not Implemented
UD0683 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $11,700 Implemented
OK0671 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $459 $863 Implemented
OK0671 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $1,789 $5,340 Implemented
OK0671 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,592 $9,500 Not Implemented
OK0671 # 07 Y:2003 07 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $114,000 $86,000 Implemented
OK0671 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $880 $318 Implemented
OK0671 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,474 $12,625 n/a
OK0671 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,945 $4,565 Implemented
MA0540 # 03 Y:2003 03 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $32,261 $17,920 Not Implemented
MA0540 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,447 $7,000 Not Implemented
MA0540 # 05 Y:2003 05 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,042 $6,200 Not Implemented
MA0540 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $295,995 $436,450 Not Implemented
MA0540 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $5,220 $650 Not Implemented
MA0540 # 08 Y:2003 08 2003 DEVELOP A REPAIR/REPLACE POLICY $3,581 $5,497 Not Implemented
MA0540 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,968 $15,662 Implemented