Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
249
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0249 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $240 | $334 | Implemented |
SU0249 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,719 | $16,400 | Implemented |
SU0249 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,403 | $19,107 | Implemented |
SU0249 # 09 Y:2007 | 09 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $103 | $457 | Not Implemented |
SU0236 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,860 | $0 | Not Implemented |
SU0236 # 02 Y:2006 | 02 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,416 | $171 | Not Implemented |
SU0236 # 03 Y:2006 | 03 | 2006 | INSTALL OCCUPANCY SENSORS | $868 | $127 | Implemented |
SU0236 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,245 | $713 | Implemented |
SU0236 # 05 Y:2006 | 05 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $1,176 | $365 | Implemented |
SU0236 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $758 | $220 | Implemented |
SU0236 # 07 Y:2006 | 07 | 2006 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $65,227 | $70,000 | Implemented |
SU0236 # 08 Y:2006 | 08 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,279 | $2,517 | Implemented |
SU0236 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $656 | $1,314 | Not Implemented |
SU0236 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,858 | $12,200 | Implemented |
SU0236 # 11 Y:2006 | 11 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,046 | $8,856 | Not Implemented |
SU0236 # 12 Y:2006 | 12 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $288 | $701 | Not Implemented |
MA0594 # 01 Y:2006 | 01 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $123,147 | $15,525 | Implemented |
MA0594 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,354 | $121,835 | Implemented |
MA0594 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,484 | $141,413 | Not Implemented |
MA0594 # 04 Y:2006 | 04 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $11,241 | $7,665 | Not Implemented |
MA0594 # 05 Y:2006 | 05 | 2006 | REDUCE VENTILATION AIR | $5,860 | $3,505 | Implemented |
MA0594 # 06 Y:2006 | 06 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,046 | $0 | Implemented |
MA0594 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $3,159 | $5,681 | Not Implemented |
MA0594 # 08 Y:2006 | 08 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,600 | $500 | Not Implemented |
MA0590 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $23,037 | $56,931 | Implemented |