IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0290 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,200 $500 n/a
UA0290 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,137 $2,005 n/a
UA0290 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $348 $452 n/a
UA0290 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,410 $555,652 n/a
UA0290 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,530 $5,091 n/a
UA0290 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $224 $224 n/a
UA0290 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $6,760 $8,397 n/a
UA0290 # 06 Y:2024 06 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $10,563 $56,271 n/a
UA0275 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,695 $11,361 Implemented
UA0275 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $2,032 $377 Implemented
UA0275 # 03 Y:2023 03 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,448 $4,532 Implemented
UA0275 # 04 Y:2023 04 2023 INSTALL TIMERS AND/OR THERMOSTATS $824 $227 Implemented
UA0275 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $760 $310 Implemented
UA0273 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $418,766 $1,440,000 Implemented
UA0273 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,016 $211 Not Implemented
UA0273 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,327 $500 Not Implemented
UA0273 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,195 $2,890 Not Implemented
UA0273 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $913 $3,015 Not Implemented
UA0262 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,910 $400 Not Implemented
UA0262 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,699 $2,060 Implemented
UA0262 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,023 $44,464 Implemented
UA0262 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,104 $4,929 Implemented
UA0257 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,160 $80,028 Implemented
UA0257 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,505 $1,000 Implemented
UA0257 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,731 $150 Implemented