IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0744 # 06 Y:2022 06 2022 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $60,192 $4,219 n/a
CO0744 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,731 $3,276 n/a
CO0744 # 05 Y:2022 05 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $210,000 $58,000 n/a
CO0744 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $881 $2,407 n/a
CO0744 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,175 $7,076 n/a
CO0744 # 04 Y:2022 04 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $1,847 $9,768 n/a
CO0744 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $26,159 $136,687 n/a
CO0720 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,840 $300 Implemented
CO0720 # 04 Y:2016 04 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,510 $27,600 Not Implemented
CO0720 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,190 $67,155 Implemented
CO0720 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,640 $62,670 Not Implemented
CO0720 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $930 $1,330 Not Implemented
CO0712 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,140 $22,400 n/a
CO0712 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,050 $1,000 n/a
CO0712 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,180 $7,940 n/a
CO0679 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $1,740 $1,320 Implemented
CO0679 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,450 $15,070 Implemented
CO0679 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $4,160 Not Implemented
CO0679 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $9,040 $500 Implemented
CO0679 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,910 $360 Not Implemented
CO0673 # 05 Y:2013 05 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,240 $0 Implemented
CO0673 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $530 Implemented
CO0673 # 03 Y:2013 03 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,060 $4,216 Implemented
CO0673 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,160 $6,540 Not Implemented
CO0673 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $7,680 $8,440 Not Implemented