IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,003

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0351 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,130 $60 Implemented
LL0351 # 04 Y:2011 04 2011 USE PHOTOCELL CONTROLS $740 $90 Implemented
LL0351 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223 $40 Implemented
LL0351 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $178 $105 Implemented
SD0435 # 01 Y:2011 01 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $704 $0 Implemented
SD0435 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,875 $700 Implemented
SD0435 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,988 $4,310 Implemented
SD0435 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,282 $1,000 Implemented
SD0435 # 06 Y:2011 06 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $866 $840 Implemented
TT0065 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $12,200 Implemented
TT0065 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,990 $5,000 Implemented
TT0065 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $65,500 $61,500 Implemented
WV0426 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,820 $1,000 Implemented
WV0426 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,303 $29,900 Implemented
WV0426 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,594 $458 Implemented
WV0426 # 08 Y:2011 08 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,197 $0 Implemented
WV0426 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $723 $21 Implemented
LE0317 # 16 Y:2011 16 2011 INSTALL OCCUPANCY SENSORS $153 $1,000 Implemented
LE0317 # 01 Y:2011 01 2011 REPLACE BOILER $284,580 $500,000 Implemented
LE0317 # 02 Y:2011 02 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $185,253 $118,000 Implemented
LE0317 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,617 $13,469 Implemented
LE0317 # 06 Y:2011 06 2011 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0317 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $12,721 $22,000 Implemented
LE0317 # 08 Y:2011 08 2011 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,375 $100,000 Implemented
LE0317 # 09 Y:2011 09 2011 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,387 $8,000 Implemented