Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,003
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0007 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,672 | $75 | Implemented |
DL0007 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,535 | $140 | Implemented |
DL0007 # 05 Y:2007 | 05 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $181 | $34 | Implemented |
DL0007 # 07 Y:2007 | 07 | 2007 | REPLACE BOILER | $1,325 | $10,425 | Implemented |
UM0325 # 01 Y:2007 | 01 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $56,621 | $14,400 | Implemented |
UM0325 # 04 Y:2007 | 04 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,212 | $0 | Implemented |
UM0325 # 06 Y:2007 | 06 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,729 | $1,620 | Implemented |
UA0007 # 01 Y:2007 | 01 | 2007 | USE PHOTOCELL CONTROLS | $1,443 | $494 | Implemented |
UA0007 # 05 Y:2007 | 05 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,900 | $0 | Implemented |
UA0007 # 08 Y:2007 | 08 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $23,435 | $0 | Implemented |
UF0404 # 01 Y:2007 | 01 | 2007 | USE OPTIMUM THICKNESS INSULATION | $45,739 | $1,287 | Implemented |
UF0404 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM THICKNESS INSULATION | $10,863 | $369 | Implemented |
UF0404 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $603 | $230 | Implemented |
UF0404 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,133 | $15,174 | Implemented |
UF0404 # 07 Y:2007 | 07 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,571 | $15,174 | Implemented |
UF0404 # 08 Y:2007 | 08 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,000 | $270 | Implemented |
MI0151 # 02 Y:2007 | 02 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $67,528 | $120 | Implemented |
MI0151 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,594 | $20,498 | Implemented |
MI0151 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,109 | $1,074 | Implemented |
SF0345 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,999 | $3,759 | Implemented |
SF0345 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,115 | $6,510 | Implemented |
SF0345 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,339 | $4,380 | Implemented |
SD0396 # 02 Y:2007 | 02 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,283 | $28,500 | Implemented |
SD0396 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,509 | $2,200 | Implemented |
SD0396 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $945 | $1,000 | Implemented |