Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,072
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0367 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,155 | $0 | Not Implemented |
SU0367 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,427 | $100 | Implemented |
SU0367 # 04 Y:2014 | 04 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,111 | $527 | Not Implemented |
SU0367 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $320 | $100 | Implemented |
SU0367 # 06 Y:2014 | 06 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $913 | $646 | Not Implemented |
SU0367 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $712 | $582 | Implemented |
SU0367 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,369 | $3,256 | Not Implemented |
SU0367 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,775 | $6,702 | Not Implemented |
SU0367 # 10 Y:2014 | 10 | 2014 | UPGRADE OBSOLETE EQUIPMENT | $263 | $1,078 | Implemented |
IP0028 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $545 | $0 | Implemented |
IP0028 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $216 | $13 | Implemented |
IP0028 # 03 Y:2014 | 03 | 2014 | INSTALL SET-BACK TIMERS | $1,201 | $196 | Implemented |
IP0028 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $147 | $76 | Implemented |
IP0028 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $282 | $357 | Implemented |
IP0028 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $655 | $2,312 | Not Implemented |
IP0028 # 07 Y:2014 | 07 | 2014 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,354 | $5,025 | Not Implemented |
AM0662 # 01 Y:2014 | 01 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $72,800 | $26,790 | Implemented |
AM0662 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,492 | $23,175 | Implemented |
AM0662 # 03 Y:2014 | 03 | 2014 | PAY UTILITY BILLS ON TIME | $18,665 | $0 | Implemented |
AM0662 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,185 | $20 | Implemented |
AM0662 # 05 Y:2014 | 05 | 2014 | METER WASTE WATER | $10,350 | $2,650 | Not Implemented |
AM0662 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,178 | $3,000 | Implemented |
AM0662 # 07 Y:2014 | 07 | 2014 | USE SYNTHETIC LUBRICANT | $6,010 | $0 | Not Implemented |
AM0662 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,535 | $18,000 | Not Implemented |
AM0662 # 09 Y:2014 | 09 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,018 | $0 | Not Implemented |