IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0229 # 06 Y:2012 06 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,915 $80 Implemented
MI0229 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,865 $1,660 Implemented
MI0229 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,849 $80 Implemented
MI0229 # 09 Y:2012 09 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,382 $385 Implemented
MI0229 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $2,325 $480 Implemented
MI0229 # 11 Y:2012 11 2012 INSTALL SKYLIGHTS $2,117 $3,000 Implemented
MI0229 # 12 Y:2012 12 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,297 $460 Implemented
MI0229 # 13 Y:2012 13 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $624 $1,852 Implemented
AM0615 # 01 Y:2012 01 2012 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $455,515 $1,000,000 Not Implemented
AM0615 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,021 $107,528 Not Implemented
AM0615 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,924 $900 Implemented
AM0615 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,856 $27,318 Implemented
AM0615 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $13,704 $10,754 Implemented
AM0615 # 06 Y:2012 06 2012 REPAIR OR REPLACE STEAM TRAPS $10,200 $273 Implemented
AM0615 # 07 Y:2012 07 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,909 $27,494 Implemented
AM0615 # 08 Y:2012 08 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,659 $875 Implemented
AM0615 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,788 $13 Implemented
AM0615 # 10 Y:2012 10 2012 USE SYNTHETIC LUBRICANT $760 $0 Implemented
IA0485 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,660 $273 Implemented
IA0485 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $688 $525 Implemented
IA0485 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,133 $1,343 Implemented
IA0485 # 04 Y:2012 04 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,683 $1,560 Not Implemented
IA0485 # 05 Y:2012 05 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $774 $989 Implemented
IA0485 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $910 $3,310 Not Implemented
IA0485 # 07 Y:2012 07 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,493 $2,044 Implemented