IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0356 # 01 Y:2010 01 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,993 $19,250 Not Implemented
MS0356 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,215 $14,101 Not Implemented
MS0356 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,623 $4,140 Not Implemented
MS0356 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,080 $418 Not Implemented
MS0356 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $372 $119 Not Implemented
UD0820 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,511 $30,000 Not Implemented
UD0820 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $644 $1 Implemented
UD0820 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,408 $5,940 Implemented
UD0820 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,757 $4,868 Implemented
UD0820 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $4,465 Implemented
UD0820 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,316 $2,585 Implemented
UD0820 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $50 $45 Not Implemented
UD0820 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $535 $500 Implemented
UD0820 # 09 Y:2010 09 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $513 $1,580 Implemented
UD0820 # 10 Y:2010 10 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $17,532 $7,000 Implemented
UD0820 # 11 Y:2010 11 2010 INSULATE BARE EQUIPMENT $3,075 $8,700 Not Implemented
UD0820 # 12 Y:2010 12 2010 RECOVER WASTE HEAT FROM EQUIPMENT $34,849 $39,289 Not Implemented
UD0820 # 13 Y:2010 13 2010 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $7,994 $45,000 Not Implemented
UD0820 # 14 Y:2010 14 2010 USE RADIANT HEATER FOR SPOT HEATING $4,962 $4,550 Implemented
NC0411 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,139 $5,000 Implemented
NC0411 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $15,453 $30,000 Not Implemented
NC0411 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,708 $500 Implemented
NC0411 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,307 $100 Implemented
NC0411 # 05 Y:2010 05 2010 USE POWER DURING OFF-PEAK PERIODS $400 $100 Implemented
TT0055 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $5,009 $17,120 Not Implemented