Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,072
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0017 # 01 Y:2008 | 01 | 2008 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $8,697 | $1,600 | Implemented |
MZ0017 # 02 Y:2008 | 02 | 2008 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $9,270 | $175 | Not Implemented |
MZ0017 # 03 Y:2008 | 03 | 2008 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $13,980 | $15,763 | Implemented |
UW0010 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,108 | $4,160 | Implemented |
UW0010 # 02 Y:2008 | 02 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,398 | $75,533 | Not Implemented |
UW0010 # 03 Y:2008 | 03 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,340 | $3,000 | Not Implemented |
AM0536 # 01 Y:2008 | 01 | 2008 | INSULATE BARE EQUIPMENT | $26,800 | $4,160 | Implemented |
AM0536 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,000 | $230 | Implemented |
AM0536 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,250 | $1,020 | Not Implemented |
AM0536 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,960 | $822 | Implemented |
AM0536 # 05 Y:2008 | 05 | 2008 | USE SYNTHETIC LUBRICANT | $1,570 | $0 | Not Implemented |
AM0536 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,255 | $480 | Not Implemented |
MI0159 # 01 Y:2008 | 01 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,617 | $120 | Implemented |
MI0159 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,137 | $1,210 | Implemented |
MI0159 # 03 Y:2008 | 03 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,615 | $3,475 | Implemented |
MI0159 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,266 | $3,978 | Implemented |
MI0159 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,337 | $40 | Implemented |
MI0159 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,238 | $280 | Implemented |
MI0159 # 07 Y:2008 | 07 | 2008 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,875 | $120 | Not Implemented |
MI0159 # 08 Y:2008 | 08 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,521 | $480 | Implemented |
SF0350 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,920 | $300 | Implemented |
SF0350 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,274 | $1,332 | Implemented |
SF0350 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $399 | $492 | Implemented |
SF0350 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,126 | $2,145 | Not Implemented |
SF0350 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $644 | $4,267 | Not Implemented |