IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0121 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,015 $964 Implemented
MI0121 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $996 $56 Not Implemented
MI0121 # 06 Y:2006 06 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $362 $0 Not Implemented
AM0500 # 01 Y:2006 01 2006 INSTALL AUTOMATIC PACKING EQUIPMENT $183,000 $50,000 Not Implemented
AM0500 # 02 Y:2006 02 2006 INSTALL AUTOMATIC PACKING EQUIPMENT $142,000 $225,000 Not Implemented
AM0500 # 03 Y:2006 03 2006 INSTALL AUTOMATIC PACKING EQUIPMENT $40,600 $50,000 Not Implemented
AM0500 # 04 Y:2006 04 2006 INSTALL AUTOMATIC PACKING EQUIPMENT $30,500 $272 Not Implemented
AM0500 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $6,900 $6,900 Implemented
AM0500 # 06 Y:2006 06 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,520 $0 Not Implemented
AM0500 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,800 $0 Implemented
AM0500 # 08 Y:2006 08 2006 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $430 $0 Implemented
AM0500 # 09 Y:2006 09 2006 USE SYNTHETIC LUBRICANT $422 $0 Not Implemented
AM0500 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $343 $192 Implemented
MA0590 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,037 $56,931 Implemented
MA0590 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,269 $30,445 Not Implemented
MA0590 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,393 $12,255 Not Implemented
MA0590 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $3,295 Not Implemented
MA0590 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,630 $7,000 Not Implemented
MA0590 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,603 $3,312 Implemented
MA0590 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,408 $1,000 Implemented
MA0590 # 08 Y:2006 08 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $29,100 $25,000 Not Implemented
MA0590 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $10,500 $2,000 Implemented
MA0590 # 10 Y:2006 10 2006 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $9,818 $6,420 Implemented
MA0590 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,286 $21,300 Not Implemented
WI0504 # 01 Y:2006 01 2006 MODIFY WORKLOAD $43,120 $4,500 Implemented