Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,072
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0786 # 03 Y:2004 | 03 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $33,280 | $25,000 | Not Implemented |
GT0786 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,700 | $22,500 | Not Implemented |
GT0786 # 05 Y:2004 | 05 | 2004 | CLEAN CONDENSER TUBES | $22,690 | $3,000 | Implemented |
GT0786 # 06 Y:2004 | 06 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,500 | $0 | Not Implemented |
GT0786 # 07 Y:2004 | 07 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,600 | $35 | Implemented |
GT0786 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,040 | $3,737 | Not Implemented |
GT0782 # 01 Y:2004 | 01 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,120 | $5,800 | Not Implemented |
GT0782 # 02 Y:2004 | 02 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $9,340 | $2,000 | Not Implemented |
GT0782 # 03 Y:2004 | 03 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $7,210 | $3,000 | Not Implemented |
GT0782 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,280 | $2,145 | Implemented |
GT0782 # 05 Y:2004 | 05 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,625 | $200 | Implemented |
GT0782 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $540 | $450 | Implemented |
GT0782 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $610 | $2,340 | Implemented |
SU0187 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,725 | $0 | Not Implemented |
SU0187 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,502 | $350 | Implemented |
SU0187 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $513 | $442 | Not Implemented |
SU0187 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,177 | $53,000 | Not Implemented |
SU0187 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,721 | $10,129 | Implemented |
SU0187 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $1,206 | $3,817 | Not Implemented |
LM0075 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $757 | $175 | Implemented |
LM0075 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,356 | $1,854 | Not Implemented |
LM0075 # 03 Y:2004 | 03 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $552 | $779 | Not Implemented |
LM0075 # 04 Y:2004 | 04 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $156,419 | $6,500 | Implemented |
LM0075 # 05 Y:2004 | 05 | 2004 | DEVELOP STANDARD OPERATING PROCEDURES | $14,640 | $6,500 | Not Implemented |
LM0075 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $309 | $101 | Implemented |