IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,827

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0259 # 06 Y:2003 06 2003 ADD AREA LIGHTING SWITCHES $3,306 $1,200 Not Implemented
NC0259 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $862 Implemented
NC0259 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,879 $1,740 Implemented
NC0259 # 09 Y:2003 09 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,286 $10,000 Not Implemented
NC0259 # 10 Y:2003 10 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,785 $12,240 Implemented
NC0259 # 11 Y:2003 11 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $3,651 $38,000 Not Implemented
SD0323 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $37,042 $41,000 Implemented
SD0323 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,015 $0 Not Implemented
SD0323 # 03 Y:2003 03 2003 INSTALL SKYLIGHTS $14,068 $6,000 Not Implemented
SD0323 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,373 $19,250 Not Implemented
SD0323 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,024 $2,500 Not Implemented
SD0323 # 06 Y:2003 06 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,436 $1,116 Implemented
SD0323 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,039 $0 Not Implemented
SD0323 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,150 $5,000 Not Implemented
SD0323 # 09 Y:2003 09 2003 $44,000 $25,000 Not Implemented
MS0226 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,996 $0 Not Implemented
MS0226 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,859 $2,372 Implemented
MS0226 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,660 $1,669 Not Implemented
MS0226 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,417 $205 Implemented
MS0226 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $886 $591 Not Implemented
UD0670 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $9,320 $4,000 Not Implemented
UD0670 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,300 $5,520 Not Implemented
UD0670 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,440 $20,540 Implemented
UD0670 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,218 $0 Implemented
UD0670 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,644 $3,620 Not Implemented