IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,061

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0053 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,991 $169 Implemented
MI0053 # 06 Y:2003 06 2003 PAY BILLS ON TIME TO AVOID LATE FEES $4,115 $0 Implemented
WV0258 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,615 $80 Not Implemented
WV0258 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,539 $0 Not Implemented
WV0258 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $802 $170 Not Implemented
WV0258 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $931 $44 Implemented
WV0258 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $646 $244 Implemented
WV0258 # 06 Y:2003 06 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,052 $0 Not Implemented
WV0258 # 07 Y:2003 07 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,432 $1,000 Implemented
WV0258 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,129 $525 Implemented
WV0258 # 09 Y:2003 09 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,163 $220 Implemented
WV0258 # 10 Y:2003 10 2003 USE OPTIMUM THICKNESS INSULATION $3,010 $518 Not Implemented
WV0258 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $7,852 $2,734 Implemented
WV0258 # 12 Y:2003 12 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,489 $200 Implemented
WV0258 # 13 Y:2003 13 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,945 $250 Implemented
SF0254 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,176 $134 Not Implemented
SF0254 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,744 $1,542 Not Implemented
SF0254 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $924 $587 Not Implemented
SF0254 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $1,749 Not Implemented
SF0254 # 05 Y:2003 05 2003 INSTALL SKYLIGHTS $1,924 $12,971 Not Implemented
SF0254 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $7,343 $11,038 Not Implemented
MA0527 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,223 $224,940 Not Implemented
MA0527 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,470 $16,940 n/a
MA0527 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,813 $23,660 Not Implemented
MA0527 # 04 Y:2003 04 2003 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $3,067 $150 Not Implemented