Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
763
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1017 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,299 | $0 | Implemented |
UD1017 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,128 | $500 | Not Implemented |
UD1017 # 06 Y:2020 | 06 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $955 | $0 | Not Implemented |
UD1017 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $25,311 | $31,200 | Not Implemented |
UD1017 # 08 Y:2020 | 08 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,360 | $16,720 | Not Implemented |
CW0113 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $3,092 | $1,969 | Not Implemented |
CW0113 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,683 | $10,280 | Implemented |
CW0113 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $13,673 | $2,250 | Not Implemented |
CW0113 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $583 | $1,600 | Implemented |
CW0113 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $656 | $810 | Not Implemented |
CW0113 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $941 | $105 | Implemented |
CW0113 # 02 Y:2020 | 02 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $104,454 | $200,550 | Not Implemented |
CW0113 # 01 Y:2020 | 01 | 2020 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $3,565 | $1,858 | Implemented |
UD1009 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $32,116 | $0 | Implemented |
UD1009 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,826 | $1,000 | Implemented |
UD1009 # 03 Y:2020 | 03 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $78,282 | $44,250 | Not Implemented |
UD1009 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,717 | $4,388 | Implemented |
UD1009 # 05 Y:2020 | 05 | 2020 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $107,302 | $83,000 | Implemented |
UD1009 # 06 Y:2020 | 06 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $100,517 | $151,300 | Not Implemented |
UD1009 # 07 Y:2020 | 07 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $73,844 | $147,736 | Not Implemented |
UD1005 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,555 | $0 | Not Implemented |
UD1005 # 03 Y:2019 | 03 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,736 | $12,025 | Not Implemented |
UD1005 # 02 Y:2019 | 02 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,649 | $700 | Not Implemented |
UD1005 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,162 | $50 | Not Implemented |
WV0578 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $49,796 | $9,417 | Not Implemented |