Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,072
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1057 # 02 Y:2021 | 02 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $12,483 | $56,000 | Implemented |
OK1057 # 03 Y:2021 | 03 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $533 | $1,400 | Not Implemented |
OK1057 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,960 | $0 | Implemented |
SF0575 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,492 | $100 | Not Implemented |
SF0575 # 02 Y:2021 | 02 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,510 | $0 | Not Implemented |
SF0575 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,526 | $0 | Not Implemented |
SF0575 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,084 | $0 | Implemented |
SF0575 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,642 | $1,513 | Implemented |
SF0575 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,311 | $966 | Implemented |
SF0575 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,748 | $1,047 | Implemented |
SF0575 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,559 | $16,052 | Implemented |
SF0575 # 09 Y:2021 | 09 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,137 | $1,513 | Implemented |
SF0575 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,624 | $18,284 | Implemented |
SF0575 # 11 Y:2021 | 11 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,353 | $19,986 | Implemented |
SF0575 # 12 Y:2021 | 12 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,554 | $6,764 | Implemented |
CO0741 # 01 Y:2021 | 01 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $48,927 | $491,439 | Not Implemented |
CO0741 # 02 Y:2021 | 02 | 2021 | INSTALL WIND POWERED ELECTRIC GENERATOR | $38,875 | $547,800 | Not Implemented |
CO0741 # 03 Y:2021 | 03 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,984 | $0 | Implemented |
CO0741 # 04 Y:2021 | 04 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,264 | $21,000 | Implemented |
CO0741 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,303 | $3,500 | Implemented |
CO0741 # 06 Y:2021 | 06 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,794 | $0 | Implemented |
CO0741 # 07 Y:2021 | 07 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $51,454 | $3,624 | Implemented |
CO0741 # 08 Y:2021 | 08 | 2021 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,987 | $33,250 | Not Implemented |
UU0190 # 01 Y:2021 | 01 | 2021 | INSULATE BARE EQUIPMENT | $9,772 | $5,582 | Not Implemented |
UU0190 # 02 Y:2021 | 02 | 2021 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $8,939 | $3,000 | Not Implemented |