Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,283
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0604 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $869 | $3,646 | n/a |
AS0604 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $834 | $1,268 | n/a |
AS0604 # 06 Y:2025 | 06 | 2025 | INSTALL SPECTRAL REFLECTORS / DELAMP | $559 | $17 | n/a |
AS0604 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $215 | $315 | n/a |
CI0043 # 08 Y:2024 | 08 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,248 | $800 | n/a |
CI0043 # 07 Y:2024 | 07 | 2024 | USE PHOTOCELL CONTROLS | $2,912 | $8,100 | n/a |
CI0043 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,043 | $1,380 | n/a |
CI0043 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,106 | $23,794 | n/a |
CI0043 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,483 | $12,000 | n/a |
CI0043 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $18,838 | $12,100 | n/a |
CI0043 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,970 | $7,350 | n/a |
CI0043 # 01 Y:2024 | 01 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $143,742 | $300,000 | n/a |
LE0591 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,746 | $62,882 | n/a |
LE0591 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $298 | n/a |
LE0591 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,916 | $5,984 | n/a |
LE0591 # 04 Y:2025 | 04 | 2025 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,399 | $4,500 | n/a |
LE0591 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,438 | $3,216 | n/a |
LE0591 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $482 | $140 | n/a |
LE0591 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $27,684 | $0 | n/a |
AM0936 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,227 | $30,000 | n/a |
AM0936 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $26,345 | $418,850 | n/a |
AM0936 # 04 Y:2025 | 04 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $35,490 | $397,200 | n/a |
AM0936 # 03 Y:2025 | 03 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $45,840 | $1,490 | n/a |
AM0936 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $62,000 | $644,000 | n/a |
AM0936 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $104,000 | $115,000 | n/a |