IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1912 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $90,133 $6,406 Not Implemented
UK1912 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $86,767 $5,000 Implemented
IC0222 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,363 $2,231 Implemented
IC0222 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $320 Not Implemented
IC0222 # 03 Y:2019 03 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $524 $0 Not Implemented
IC0223 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $210 $24 Not Implemented
IC0223 # 02 Y:2019 02 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $267 $2,000 Not Implemented
IC0223 # 03 Y:2019 03 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $264 $0 Not Implemented
IC0223 # 04 Y:2019 04 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $550 $0 Implemented
UD1005 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,162 $50 Not Implemented
UD1005 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,649 $700 Not Implemented
UD1005 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,736 $12,025 Not Implemented
UD1005 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,555 $0 Not Implemented
SU0488 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $27 $0 Not Implemented
SU0488 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,216 $264 Implemented
SU0488 # 03 Y:2019 03 2019 REDUCE VENTILATION AIR $2,109 $941 Not Implemented
SU0488 # 04 Y:2019 04 2019 ELIMINATE/REDUCE AN OPERATION $6,705 $3,690 Not Implemented
SU0488 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $273 $652 Not Implemented
SF0547 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,284 $0 Implemented
SF0547 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,962 $360 Implemented
SF0547 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,625 $240 Implemented
SF0547 # 04 Y:2019 04 2019 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,499 $960 Not Implemented
SF0547 # 05 Y:2019 05 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $40,841 $4,800 Not Implemented
SF0547 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,127 $1,647 Implemented
SF0547 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $4,069 $7,542 Not Implemented