IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0260 # 04 Y:2007 04 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $685 $0 Implemented
SU0260 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,644 $1,034 Implemented
SU0260 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,677 $490 Implemented
SU0260 # 07 Y:2007 07 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $142 $739 Not Implemented
SU0260 # 08 Y:2007 08 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $151,680 $914,460 Not Implemented
SU0249 # 01 Y:2007 01 2007 USE SYNTHETIC LUBRICANT $2,139 $0 Not Implemented
SU0249 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,594 $0 Implemented
SU0249 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,329 $0 Implemented
SU0249 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,685 $289 Implemented
SU0249 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,727 $589 Implemented
SU0249 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $240 $334 Implemented
SU0249 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,719 $16,400 Implemented
SU0249 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,403 $19,107 Implemented
SU0249 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $103 $457 Not Implemented
SU0236 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,860 $0 Not Implemented
SU0236 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,416 $171 Not Implemented
SU0236 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $868 $127 Implemented
SU0236 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,245 $713 Implemented
SU0236 # 05 Y:2006 05 2006 REPAIR OR REPLACE STEAM TRAPS $1,176 $365 Implemented
SU0236 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $758 $220 Implemented
SU0236 # 07 Y:2006 07 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $65,227 $70,000 Implemented
SU0236 # 08 Y:2006 08 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,279 $2,517 Implemented
SU0236 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $1,314 Not Implemented
SU0236 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,858 $12,200 Implemented
SU0236 # 11 Y:2006 11 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,046 $8,856 Not Implemented