Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
508
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0936 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $26,345 | $418,850 | n/a |
AM0936 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,227 | $30,000 | n/a |
AM0936 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $62,000 | $644,000 | n/a |
AM0936 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $104,000 | $115,000 | n/a |
AM0936 # 03 Y:2025 | 03 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $45,840 | $1,490 | n/a |
AM0936 # 04 Y:2025 | 04 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $35,490 | $397,200 | n/a |
TR0058 # 04 Y:2023 | 04 | 2023 | METER WASTE WATER | $408 | $1,511 | n/a |
TR0058 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,706 | $7,350 | n/a |
TR0058 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,832 | $216,216 | n/a |
TR0058 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $727 | $2,781 | n/a |
NT0021 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,153 | $11,393 | Implemented |
NT0021 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $88,000 | $94,845 | Not Implemented |
NT0021 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,821 | $5,609 | Not Implemented |
NT0021 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $19,175 | $6,411 | Not Implemented |
NT0021 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,130 | $0 | Implemented |
NT0021 # 07 Y:2024 | 07 | 2024 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $21,290 | $19,507 | Not Implemented |
NT0021 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,801 | $7,120 | Implemented |
NT0021 # 06 Y:2024 | 06 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $16,970 | $0 | Implemented |
AM0892 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,525 | $136,100 | n/a |
AM0892 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $255 | $1,000 | n/a |
AM0892 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $248 | $800 | n/a |
AM0892 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $711 | $506 | n/a |
AM0891 # 07 Y:2024 | 07 | 2024 | USE PHOTOCELL CONTROLS | $47 | $165 | Implemented |
AM0891 # 06 Y:2024 | 06 | 2024 | USE SYNTHETIC LUBRICANT | $340 | $980 | Not Implemented |
AM0891 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,490 | $4,220 | Implemented |