Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
200
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0198 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $2,034 | $5,600 | Not Implemented |
DL0198 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,100 | $6,477 | Not Implemented |
DL0198 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,850 | $0 | Implemented |
DL0198 # 04 Y:2021 | 04 | 2021 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $16,090 | $1,500 | Not Implemented |
DL0198 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,800 | $0 | Implemented |
DL0198 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,740 | $14,428 | Implemented |
DL0198 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,240 | $2,500 | Implemented |
DL0198 # 08 Y:2021 | 08 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,320 | $7,000 | Not Implemented |
DL0198 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $29,500 | $0 | Not Implemented |
MI0396 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,464 | $3,060 | Not Implemented |
MI0396 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,263 | $1,487 | Not Implemented |
MI0396 # 02 Y:2021 | 02 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $27,588 | $100 | Not Implemented |
MI0396 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,908 | $2,020 | Implemented |
MI0396 # 01 Y:2021 | 01 | 2021 | PAY UTILITY BILLS ON TIME | $27,408 | $0 | Implemented |
MI0396 # 06 Y:2021 | 06 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,320 | $1,290 | Not Implemented |
TT0262 # 02 Y:2021 | 02 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,441 | $15,000 | Not Implemented |
TT0262 # 01 Y:2021 | 01 | 2021 | USE SOLAR HEAT FOR HEAT | $44,686 | $476,000 | Not Implemented |
TT0262 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,023 | $2,762 | Implemented |
TT0262 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $4,646 | $3,879 | Implemented |
TT0262 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,405 | $1,640 | Not Implemented |
CL2114 # 01 Y:2021 | 01 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,537 | $0 | n/a |
CL2114 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $1,148 | $1,615 | n/a |
CL2114 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,331 | $0 | n/a |
CL2114 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $10,678 | $4,250 | n/a |
CL2114 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,420 | $37,500 | n/a |