Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
472
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0340 # 07 Y:2006 | 07 | 2006 | USE SYNTHETIC LUBRICANT | $3,001 | $90 | Implemented |
WV0340 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,647 | $1,000 | Implemented |
WV0340 # 09 Y:2006 | 09 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,384 | $800 | Implemented |
WV0340 # 10 Y:2006 | 10 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,262 | $0 | Implemented |
WV0340 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $2,152 | $439 | Implemented |
WV0340 # 12 Y:2006 | 12 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $928 | $1,270 | Implemented |
WV0340 # 13 Y:2006 | 13 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $598 | $1,170 | Implemented |
OK0722 # 03 Y:2006 | 03 | 2006 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $266 | $521 | Implemented |
OK0722 # 04 Y:2006 | 04 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,193 | $40 | Implemented |
OK0722 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,222 | $67,616 | Implemented |
OK0722 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,795 | $8,054 | Implemented |
MA0592 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $56,494 | $73,748 | Implemented |
MA0592 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,789 | $0 | Implemented |
MA0592 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,338 | $3,295 | Implemented |
MA0590 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $23,037 | $56,931 | Implemented |
MA0590 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,603 | $3,312 | Implemented |
MA0590 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,408 | $1,000 | Implemented |
MA0590 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $10,500 | $2,000 | Implemented |
MA0590 # 10 Y:2006 | 10 | 2006 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $9,818 | $6,420 | Implemented |
NC0316 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $100 | Implemented |
GT0801 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,040 | $32,725 | Implemented |
GT0801 # 03 Y:2005 | 03 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $72 | $0 | Implemented |
GT0801 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $775 | $500 | Implemented |
GT0801 # 07 Y:2005 | 07 | 2005 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $35,100 | $15,000 | Implemented |
BD0284 # 01 Y:2005 | 01 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,372 | $800 | Implemented |