IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0282 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,241 $4,067 Not Implemented
IC0282 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,144 $7,160 Implemented
IC0282 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,637 $3,994 Implemented
IC0282 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $132,518 $1,169,610 Not Implemented
IC0281 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $109,160 $660,787 Not Implemented
IC0281 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,262 $5,407 Not Implemented
IC0281 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,536 $7,857 Implemented
IC0281 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,327 $2,879 Not Implemented
IC0281 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $1,249 $804 Implemented
IC0281 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,197 $3,250 Implemented
BD0480 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $350 n/a
BD0480 # 07 Y:2016 07 2016 USE POWER DURING OFF-PEAK PERIODS $311 $20 n/a
BD0480 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $502 $1,050 n/a
BD0480 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,806 $975 n/a
BD0480 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,552 $15 n/a
BD0480 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,798 $20,250 n/a
BD0480 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,253 $17,970 n/a
BD0480 # 01 Y:2016 01 2016 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $19,348 $3,000 n/a
BD0477 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $744 $2,450 Not Implemented
BD0477 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $800 Not Implemented
BD0477 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $1,000 Not Implemented
BD0477 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,507 $20 Not Implemented
BD0477 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,131 $500 Not Implemented
BD0477 # 03 Y:2016 03 2016 USE RADIANT HEATER FOR SPOT HEATING $8,451 $20,000 Not Implemented
BD0477 # 02 Y:2016 02 2016 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $12,472 $8,000 Not Implemented