Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0018 # 01 Y:2023 | 01 | 2023 | INSULATE FEEDWATER TANK | $2,497 | $500 | n/a |
CC0018 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,506 | $10,000 | n/a |
CC0018 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $95,279 | $350,000 | n/a |
CC0018 # 05 Y:2023 | 05 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,265 | $70,000 | n/a |
CC0018 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,300 | $0 | n/a |
CC0018 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,158 | $10,000 | n/a |
NC0299 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,143 | $1,622 | Implemented |
NC0299 # 02 Y:2004 | 02 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $38,998 | $1,000 | Implemented |
NC0299 # 03 Y:2004 | 03 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,352 | $1,030 | Implemented |
NC0299 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $418,000 | $275,000 | Implemented |
NC0299 # 07 Y:2004 | 07 | 2004 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $895 | $2,195 | Implemented |
NC0299 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $373 | $100 | Implemented |
NC0299 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,382 | $9,255 | Not Implemented |
NC0269 # 04 Y:2003 | 04 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $4,027 | $1,719 | Implemented |
NC0269 # 06 Y:2003 | 06 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,654 | $2,400 | Implemented |
NC0269 # 01 Y:2003 | 01 | 2003 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $272,200 | $118,250 | Implemented |
NC0269 # 07 Y:2003 | 07 | 2003 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $14,907 | $640 | Not Implemented |
NC0269 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,974 | $9,174 | Implemented |
NC0269 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,908 | $800 | Not Implemented |
NC0269 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $16,965 | $5,128 | Implemented |
NC0260 # 03 Y:2003 | 03 | 2003 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $16,074 | $9,000 | Not Implemented |
NC0260 # 04 Y:2003 | 04 | 2003 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $606 | $176 | Not Implemented |
NC0260 # 02 Y:2003 | 02 | 2003 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $19,437 | $8,000 | Not Implemented |
NC0260 # 01 Y:2003 | 01 | 2003 | INSTALL OCCUPANCY SENSORS | $396 | $208 | Not Implemented |
NC0260 # 08 Y:2003 | 08 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $264 | $252 | Not Implemented |