IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0018 # 01 Y:2023 01 2023 INSULATE FEEDWATER TANK $2,497 $500 n/a
CC0018 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,506 $10,000 n/a
CC0018 # 06 Y:2023 06 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $95,279 $350,000 n/a
CC0018 # 05 Y:2023 05 2023 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $16,265 $70,000 n/a
CC0018 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,300 $0 n/a
CC0018 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,158 $10,000 n/a
NC0299 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,143 $1,622 Implemented
NC0299 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,998 $1,000 Implemented
NC0299 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $1,352 $1,030 Implemented
NC0299 # 01 Y:2004 01 2004 $418,000 $275,000 Implemented
NC0299 # 07 Y:2004 07 2004 SHUT OFF PILOTS IN STANDBY EQUIPMENT $895 $2,195 Implemented
NC0299 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $373 $100 Implemented
NC0299 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,382 $9,255 Not Implemented
NC0269 # 04 Y:2003 04 2003 DEVELOP A REPAIR/REPLACE POLICY $4,027 $1,719 Implemented
NC0269 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,654 $2,400 Implemented
NC0269 # 01 Y:2003 01 2003 $272,200 $118,250 Implemented
NC0269 # 07 Y:2003 07 2003 $14,907 $640 Not Implemented
NC0269 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,974 $9,174 Implemented
NC0269 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,908 $800 Not Implemented
NC0269 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $16,965 $5,128 Implemented
NC0260 # 03 Y:2003 03 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $16,074 $9,000 Not Implemented
NC0260 # 04 Y:2003 04 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $606 $176 Not Implemented
NC0260 # 02 Y:2003 02 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $19,437 $8,000 Not Implemented
NC0260 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $396 $208 Not Implemented
NC0260 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $264 $252 Not Implemented