Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
48
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0018 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,506 | $10,000 | n/a |
CC0018 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,158 | $10,000 | n/a |
CC0018 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,300 | $0 | n/a |
CC0018 # 05 Y:2023 | 05 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,265 | $70,000 | n/a |
CC0018 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $95,279 | $350,000 | n/a |
CC0018 # 01 Y:2023 | 01 | 2023 | INSULATE FEEDWATER TANK | $2,497 | $500 | n/a |
NC0299 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,143 | $1,622 | Implemented |
NC0299 # 07 Y:2004 | 07 | 2004 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $895 | $2,195 | Implemented |
NC0299 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,382 | $9,255 | Not Implemented |
NC0299 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $373 | $100 | Implemented |
NC0299 # 02 Y:2004 | 02 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $38,998 | $1,000 | Implemented |
NC0299 # 03 Y:2004 | 03 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,352 | $1,030 | Implemented |
NC0299 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $418,000 | $275,000 | Implemented |
NC0269 # 01 Y:2003 | 01 | 2003 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $272,200 | $118,250 | Implemented |
NC0269 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,974 | $9,174 | Implemented |
NC0269 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $16,965 | $5,128 | Implemented |
NC0269 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,908 | $800 | Not Implemented |
NC0269 # 06 Y:2003 | 06 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,654 | $2,400 | Implemented |
NC0269 # 07 Y:2003 | 07 | 2003 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $14,907 | $640 | Not Implemented |
NC0269 # 04 Y:2003 | 04 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $4,027 | $1,719 | Implemented |
NC0260 # 03 Y:2003 | 03 | 2003 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $16,074 | $9,000 | Not Implemented |
NC0260 # 05 Y:2003 | 05 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,263 | $16,548 | Not Implemented |
NC0260 # 06 Y:2003 | 06 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $234 | $0 | Not Implemented |
NC0260 # 07 Y:2003 | 07 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $347 | $260 | Not Implemented |
NC0260 # 08 Y:2003 | 08 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $264 | $252 | Not Implemented |