IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0611 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,370 $200 Implemented
NC0611 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,064 $100 Not Implemented
NC0611 # 04 Y:2018 04 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,227 $35,000 Not Implemented
NC0611 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $2,887 $5,685 Implemented
NC0611 # 06 Y:2018 06 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,662 $200 Implemented
NC0611 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,179 $92,653 Implemented
WV0482 # 12 Y:2014 12 2014 INSTALL OCCUPANCY SENSORS $6,231 $1,020 Not Implemented
WV0482 # 11 Y:2014 11 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $6,903 $1,632 Implemented
WV0482 # 10 Y:2014 10 2014 REDUCE EXCESSIVE BOILER BLOWDOWN $7,886 $8,000 Not Implemented
WV0482 # 09 Y:2014 09 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,132 $27,380 Not Implemented
WV0482 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,536 $9,000 Implemented
WV0482 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $17,822 $26,000 Implemented
WV0482 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,791 $38,441 Implemented
WV0482 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,144 $1,000 Implemented
WV0482 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,141 $51,865 Implemented
WV0482 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $37,833 $0 Not Implemented
WV0482 # 02 Y:2014 02 2014 REPAIR OR REPLACE STEAM TRAPS $135,791 $7,100 Implemented
WV0482 # 01 Y:2014 01 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $177,357 $198,000 Not Implemented
WV0482 # 13 Y:2014 13 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,804 $200 Implemented
WV0482 # 14 Y:2014 14 2014 DEVELOP A REPAIR/REPLACE POLICY $3,427 $708 Implemented
WV0482 # 16 Y:2014 16 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $507 $1,167 Implemented
WV0482 # 15 Y:2014 15 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,123 $5,400 Not Implemented
NC0482 # 07 Y:2013 07 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $14,522 $24,104 Not Implemented
NC0482 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,303 $4,000 Not Implemented
NC0482 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,540 $300,000 Not Implemented