Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
155
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0542 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $14,636 | $22,869 | Not Implemented |
BD0248 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,760 | $1,000 | Implemented |
BD0248 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,492 | $0 | Implemented |
BD0248 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $1,196 | $1,575 | Not Implemented |
BD0248 # 11 Y:2003 | 11 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $439 | $175 | Implemented |
BD0248 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,613 | $450 | Not Implemented |
BD0248 # 13 Y:2003 | 13 | 2003 | USE SYNTHETIC LUBRICANT | $74 | $200 | Not Implemented |
BD0248 # 14 Y:2003 | 14 | 2003 | MINIMIZE WATER USAGE | $287 | $460 | Not Implemented |
BD0248 # 16 Y:2003 | 16 | 2003 | USE POWER DURING OFF-PEAK PERIODS | $7,578 | $2,000 | Not Implemented |
BD0248 # 15 Y:2003 | 15 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $28,938 | $3,000 | Implemented |
MA0542 # 03 Y:2003 | 03 | 2003 | REDUCE VENTILATION AIR | $9,202 | $3,400 | Not Implemented |
MA0542 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,383 | $0 | Implemented |
MA0542 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,600 | $21,400 | Not Implemented |
BD0248 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,847 | $4,555 | Implemented |
BD0248 # 17 Y:2003 | 17 | 2003 | AUTOMATE PAYROLL SYSTEM | $936 | $2,500 | Not Implemented |
BD0248 # 10 Y:2003 | 10 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $663 | $600 | Implemented |
BD0248 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,140 | $23,175 | Implemented |
MA0542 # 04 Y:2003 | 04 | 2003 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $8,465 | $0 | Implemented |
BD0248 # 12 Y:2003 | 12 | 2003 | USE PHOTOCELL CONTROLS | $363 | $225 | Not Implemented |
BD0248 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,672 | $24,600 | n/a |
MA0542 # 06 Y:2003 | 06 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,232 | $500 | Implemented |
MA0542 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,659 | $3,400 | Not Implemented |
BD0248 # 04 Y:2003 | 04 | 2003 | USE RADIANT HEATER FOR SPOT HEATING | $4,072 | $5,000 | Implemented |
BD0248 # 01 Y:2003 | 01 | 2003 | INSULATE BARE EQUIPMENT | $48,696 | $13,832 | n/a |
WI0456 # 01 Y:2003 | 01 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $20,554 | $25,000 | Not Implemented |