IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0306 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $7,527 $1,600 Implemented
NC0306 # 05 Y:2004 05 2004 OPERATE BOILERS ON HIGH FIRE SETTING $6,289 $2,100 Not Implemented
NC0306 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $86,931 $100,000 n/a
NC0306 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $96,975 $360,700 Not Implemented
NC0306 # 04 Y:2004 04 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $10,305 $5,000 Implemented
NC0306 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,785 $100 Implemented
NC0306 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $79 Not Implemented
WI0478 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,493 $1,500 Not Implemented
WI0478 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $2,183 $1,200 Implemented
WI0478 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,920 $59,780 Not Implemented
WI0478 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,814 $23,430 n/a
WI0478 # 07 Y:2004 07 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,125 $2,500 Not Implemented
WI0478 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,930 $1,040 Implemented
WI0478 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,441 $0 Implemented
WI0478 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,285 $1,000 Not Implemented
NC0299 # 01 Y:2004 01 2004 $418,000 $275,000 Implemented
NC0299 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,998 $1,000 Implemented
NC0299 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $1,352 $1,030 Implemented
NC0299 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $373 $100 Implemented
NC0299 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,382 $9,255 Not Implemented
NC0299 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,143 $1,622 Implemented
NC0299 # 07 Y:2004 07 2004 SHUT OFF PILOTS IN STANDBY EQUIPMENT $895 $2,195 Implemented
SD0347 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,552 $0 Implemented
SD0347 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,721 $21,387 Not Implemented
SD0347 # 04 Y:2004 04 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,700 $18,500 Not Implemented