IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 326111 Plastics Bag and Pouch Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0426 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,485 $54,987 Implemented
SD0426 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,414 $59,920 Not Implemented
SD0426 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,632 $94,584 Not Implemented
SD0426 # 03 Y:2010 03 2010 INSTALL SKYLIGHTS $10,372 $7,660 Not Implemented
SD0426 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,943 $1,000 Implemented
SD0426 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,373 $100 Implemented
SD0347 # 05 Y:2004 05 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $128,000 $145,000 Not Implemented
SD0347 # 04 Y:2004 04 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,700 $18,500 Not Implemented
SD0347 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,721 $21,387 Not Implemented
SD0347 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,552 $0 Implemented
SD0347 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $450 Implemented
SD0346 # 02 Y:2004 02 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,306 $9,465 Implemented
SD0346 # 05 Y:2004 05 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $128,000 $115,000 Not Implemented
SD0346 # 04 Y:2004 04 2004 INSTALL SKYLIGHTS $8,771 $21,250 Not Implemented
SD0346 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,189 $413 Not Implemented
SD0346 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,785 $320 Implemented
SD0345 # 07 Y:2004 07 2004 PAY UTILITY BILLS ON TIME $2,375 $0 Not Implemented
SD0345 # 06 Y:2004 06 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $235,176 $320,000 Not Implemented
SD0345 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,230 $1,650 Implemented
SD0345 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,912 $2,360 Not Implemented
SD0345 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,200 $2,396 Not Implemented
SD0345 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,852 $16,492 Implemented
SD0345 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,904 $560 Implemented
LM0065 # 01 Y:2004 01 2004 DISCONNECT BALLASTS $517 $200 Implemented
LM0065 # 06 Y:2004 06 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $53,000 $8,000 Not Implemented