Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 326112 | Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2306 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $103,804 | $14,859 | Not Implemented |
UL2306 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,055 | $314,019 | Not Implemented |
UL2306 # 03 Y:2023 | 03 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,595 | $12,891 | Not Implemented |
UL2306 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $336 | $600 | Implemented |
UL2306 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,019 | $0 | Not Implemented |
CC0018 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,506 | $10,000 | n/a |
CC0018 # 01 Y:2023 | 01 | 2023 | INSULATE FEEDWATER TANK | $2,497 | $500 | n/a |
CC0018 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $95,279 | $350,000 | n/a |
CC0018 # 05 Y:2023 | 05 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,265 | $70,000 | n/a |
CC0018 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,300 | $0 | n/a |
CC0018 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,158 | $10,000 | n/a |
WM0195 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,142 | $1,715 | Not Implemented |
WM0195 # 08 Y:2023 | 08 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,986 | $2,700 | Implemented |
WM0195 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $1,997 | $1,000 | Implemented |
WM0195 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,381 | $700 | Implemented |
WM0195 # 05 Y:2023 | 05 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,687 | $0 | Implemented |
WM0195 # 04 Y:2023 | 04 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,436 | $3,735 | Not Implemented |
WM0195 # 03 Y:2023 | 03 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $5,128 | $1,700 | Not Implemented |
WM0195 # 02 Y:2023 | 02 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $15,091 | $13,400 | Not Implemented |
WM0195 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,725 | $13,127 | Implemented |
UU0214 # 08 Y:2023 | 08 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $23,820 | $214,625 | Not Implemented |
UU0214 # 07 Y:2023 | 07 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $24,046 | $226,100 | Not Implemented |
UU0214 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $550 | $1,558 | Implemented |
UU0214 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $701 | $1,150 | Not Implemented |
UU0214 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,274 | $495 | Implemented |