IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

530

matching recommendations
Reset
NAICS 326113 Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0340 # 08 Y:2006 08 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,647 $1,000 Implemented
WV0340 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,384 $800 Implemented
WV0340 # 10 Y:2006 10 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,262 $0 Implemented
WV0340 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $2,152 $439 Implemented
WV0340 # 12 Y:2006 12 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $928 $1,270 Implemented
WV0340 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $1,170 Implemented
MA0592 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,191 $368,500 Not Implemented
MA0592 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,494 $73,748 Implemented
MA0592 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,861 $138,775 Not Implemented
MA0592 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,789 $0 Implemented
MA0592 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,338 $3,295 Implemented
NC0316 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,271 $87,125 Not Implemented
NC0316 # 02 Y:2005 02 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,570 $26,949 Not Implemented
NC0316 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $491 $321 Not Implemented
NC0316 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $100 Implemented
GT0801 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,040 $32,725 Implemented
GT0801 # 02 Y:2005 02 2005 USE PHOTOCELL CONTROLS $7,520 $32,480 Not Implemented
GT0801 # 03 Y:2005 03 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $72 $0 Implemented
GT0801 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $500 Implemented
GT0801 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,820 $500 Not Implemented
GT0801 # 06 Y:2005 06 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,780 $7,500 Not Implemented
GT0801 # 07 Y:2005 07 2005 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $35,100 $15,000 Implemented
GT0801 # 08 Y:2005 08 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,320 $10,000 Not Implemented
GT0801 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,950 $6,600 Not Implemented
GT0801 # 10 Y:2005 10 2005 COMBINE UTILITY METERS $12,370 $0 Not Implemented