IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0426 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,407 $1,500 Implemented
UM0426 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,910 $3,500 Not Implemented
UM0426 # 02 Y:2013 02 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,400 $12,000 Not Implemented
UM0426 # 01 Y:2013 01 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,129 $17,000 Implemented
UM0390 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $109,437 $163,095 Not Implemented
UM0390 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,502 $10,000 Not Implemented
UM0390 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $11,887 $2,716 Not Implemented
UM0390 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,753 $200 Not Implemented
UM0390 # 05 Y:2011 05 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $27,012 $59,940 Not Implemented
UM0390 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,628 $5,000 Not Implemented
UM0265 # 01 Y:2004 01 2004 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $105,689 $64,000 n/a
UM0265 # 08 Y:2004 08 2004 COVER OPEN TANKS $855 $1,500 Not Implemented
UM0265 # 07 Y:2004 07 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,652 $250 Not Implemented
UM0265 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,069 $975 Not Implemented
UM0265 # 05 Y:2004 05 2004 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $6,581 $10,000 n/a
UM0265 # 04 Y:2004 04 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $11,886 $30,000 n/a
UM0265 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,733 $15,532 n/a
UM0265 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $30,525 $30,000 n/a
UM0230 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,775 $18,691 Not Implemented
UM0230 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,479 $300 Not Implemented
UM0230 # 03 Y:2003 03 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,163 $4,500 Implemented
UM0230 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,688 $8,100 n/a
UM0230 # 05 Y:2003 05 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $37,100 $171,200 Not Implemented
UM0230 # 06 Y:2003 06 2003 USE OPTIMUM THICKNESS INSULATION $4,200 $1,500 Not Implemented