Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

928

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0411 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,307 $100 Implemented
NC0411 # 05 Y:2010 05 2010 USE POWER DURING OFF-PEAK PERIODS $400 $100 Implemented
MZ0048 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,738 $3,000 Not Implemented
MZ0048 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,520 $1,160 Implemented
MZ0048 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $36,058 $92,296 Implemented
MZ0048 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,649 $0 Not Implemented
MZ0048 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $5,639 $0 Implemented
MZ0048 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,307 $5,859 Not Implemented
MZ0048 # 07 Y:2010 07 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $62,629 $5,600 Not Implemented
MZ0043 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $20,400 Implemented
MZ0043 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,634 $860 Implemented
MZ0043 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $2,319 $480 Implemented
MZ0043 # 04 Y:2009 04 2009 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $627 $1,800 Implemented
MZ0043 # 05 Y:2009 05 2009 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,387 $3,600 Implemented
MZ0043 # 06 Y:2009 06 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,995 $1 Implemented
MZ0043 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,009 $500 Not Implemented
MZ0043 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $192,075 $12,080 Implemented
MZ0043 # 09 Y:2009 09 2009 MOVE BOILER TO MORE EFFICIENT LOCATION $10,937 $3,000 Implemented
UD0807 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,275 $2,000 Implemented
UD0807 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,575 $1,000 Implemented
UD0807 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $65,548 $15,550 Not Implemented
UD0807 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,604 $1,000 Not Implemented
UD0807 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,056 $52,550 Not Implemented
UD0807 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $1,564 $7,000 Not Implemented
UD0807 # 07 Y:2009 07 2009 OPTIMIZE PLANT POWER FACTOR $78,142 $100,000 Not Implemented