Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsNAICS | 32612 | Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0895 # 09 Y:2014 | 09 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,388 | $800 | Implemented |
UD0895 # 10 Y:2014 | 10 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,520 | $4,275 | Implemented |
UD0875 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,925 | $4,300 | Not Implemented |
UD0875 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,208 | $1,000 | Not Implemented |
UD0875 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,013 | $0 | Implemented |
UD0875 # 04 Y:2013 | 04 | 2013 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $10,323 | $0 | Not Implemented |
UD0875 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,804 | $5,000 | Not Implemented |
UD0875 # 06 Y:2013 | 06 | 2013 | INSULATE BARE EQUIPMENT | $4,345 | $1,205 | Not Implemented |
UD0844 # 01 Y:2011 | 01 | 2011 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $170,257 | $280,000 | Not Implemented |
UD0844 # 02 Y:2011 | 02 | 2011 | USE REACTIVE RINSING | $70,989 | $30,000 | Not Implemented |
UD0844 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $11,543 | $16,000 | Not Implemented |
UD0844 # 04 Y:2011 | 04 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $33,247 | $2,000 | Not Implemented |
UD0844 # 05 Y:2011 | 05 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,557 | $0 | Implemented |
UD0844 # 06 Y:2011 | 06 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $20,051 | $18,555 | Not Implemented |
UD0844 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,542 | $0 | Not Implemented |
UD0844 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,988 | $5,000 | Not Implemented |
UD0844 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,616 | $500 | Not Implemented |
UD0844 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $267 | $0 | Implemented |
UD0844 # 11 Y:2011 | 11 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,123 | $1,000 | Implemented |
UD0844 # 12 Y:2011 | 12 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,508 | $16,000 | Not Implemented |
UD0844 # 13 Y:2011 | 13 | 2011 | USE OPTIMUM TEMPERATURE | $3,225 | $0 | Not Implemented |
UD0844 # 14 Y:2011 | 14 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,762 | $0 | Implemented |
UD0844 # 15 Y:2011 | 15 | 2011 | REDUCE VENTILATION AIR | $17,779 | $0 | Not Implemented |
UD0807 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,275 | $2,000 | Implemented |
UD0807 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,575 | $1,000 | Implemented |