Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
928
matching recommendationsNAICS | 32612 | Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1055 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,704 | $1,561 | Not Implemented |
TT0256 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,092 | $12,000 | Not Implemented |
TT0256 # 02 Y:2021 | 02 | 2021 | METER WASTE WATER | $10,722 | $2,150 | Not Implemented |
TT0256 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,816 | $5,000 | Not Implemented |
TT0256 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,560 | $150 | Not Implemented |
TT0256 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,866 | $29,886 | Not Implemented |
TT0256 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $825 | $3,000 | Not Implemented |
TT0256 # 07 Y:2021 | 07 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $1,460 | $250 | Not Implemented |
TT0256 # 08 Y:2021 | 08 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $605 | $40 | Not Implemented |
TT0256 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $2,540 | $588 | Not Implemented |
TT0256 # 10 Y:2021 | 10 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,667 | $2,040 | Not Implemented |
NL0057 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $74,696 | $154,720 | Not Implemented |
NL0057 # 02 Y:2021 | 02 | 2021 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $20,793 | $13,100 | Not Implemented |
NL0057 # 03 Y:2021 | 03 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,271 | $16,980 | Not Implemented |
NL0057 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,345 | $11,175 | Implemented |
NL0057 # 05 Y:2021 | 05 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $4,782 | $15,170 | Implemented |
NL0057 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,211 | $2,500 | Implemented |
MZ0305 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,825 | $9,000 | Implemented |
MZ0305 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,692 | $44,928 | Implemented |
MZ0305 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27,350 | $93,000 | Implemented |
MZ0305 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $579 | $320 | Implemented |
MZ0305 # 05 Y:2021 | 05 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $16,340 | $5,200 | Implemented |
MZ0305 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,689 | $240 | Implemented |
WV0596 # 01 Y:2020 | 01 | 2020 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $103,798 | $40,718 | Implemented |
WV0596 # 17 Y:2020 | 17 | 2020 | INSULATE BARE EQUIPMENT | $308 | $85 | Not Implemented |