IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0934 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,069 $10,000 Not Implemented
OK0934 # 05 Y:2016 05 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,990 $0 Not Implemented
OK0934 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $63,243 $3,161 Implemented
OK0934 # 03 Y:2016 03 2016 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $134,039 $1,300 Implemented
OK0934 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,615 $915 Not Implemented
OK0934 # 01 Y:2016 01 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $27,456 $25,000 Not Implemented
OK0921 # 04 Y:2015 04 2015 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $89,313 $72,000 Implemented
OK0921 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,838 $28,060 Implemented
OK0921 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,026 $832 Not Implemented
OK0921 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $13,915 $4,348 Implemented
OK0921 # 05 Y:2015 05 2015 REDUCE FLUID FLOW RATES $32,332 $5,000 Implemented
LL0304 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,266 $14,840 Implemented
LL0304 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,876 $20,949 Not Implemented
LL0304 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $9,892 $1,118 Not Implemented
LL0304 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,714 $30 Not Implemented
LL0304 # 05 Y:2008 05 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,456 $825 Not Implemented
LL0304 # 06 Y:2008 06 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $823 $1,246 Not Implemented
LL0304 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $70 Implemented
MS0321 # 01 Y:2007 01 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,161 $1,400 Not Implemented
MS0321 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,742 $306 Implemented
MS0321 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,455 $2,724 Not Implemented
MS0321 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $854 $455 Not Implemented
LL0266 # 06 Y:2007 06 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $492 $942 Not Implemented
LL0266 # 05 Y:2007 05 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,916 $378 Not Implemented
LL0266 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,193 $795 Not Implemented