IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0305 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,689 $240 Implemented
MZ0305 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,825 $9,000 Implemented
MZ0305 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,350 $93,000 Implemented
MZ0305 # 05 Y:2021 05 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $16,340 $5,200 Implemented
MZ0305 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $579 $320 Implemented
MZ0305 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,692 $44,928 Implemented
MZ0280 # 10 Y:2019 10 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,747 $6,080 Not Implemented
MZ0280 # 09 Y:2019 09 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,436 $8,160 Not Implemented
MZ0280 # 08 Y:2019 08 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,754 $3,520 Not Implemented
MZ0280 # 07 Y:2019 07 2019 PAY UTILITY BILLS ON TIME $5,205 $0 Not Implemented
MZ0280 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,016 $3,196 Not Implemented
MZ0280 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $14,313 $9,858 Not Implemented
MZ0280 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,792 $2,148 Not Implemented
MZ0280 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,503 $24,934 Not Implemented
MZ0280 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $23,499 $2,058 Not Implemented
MZ0280 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,867 $24,520 Not Implemented
MZ0280 # 11 Y:2019 11 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,072 $1,664 Not Implemented
MZ0280 # 12 Y:2019 12 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $550 Not Implemented
BD0452 # 09 Y:2014 09 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,911 $80 Not Implemented
BD0452 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $435 Implemented
BD0452 # 06 Y:2014 06 2014 USE RADIANT HEATER FOR SPOT HEATING $909 $3,300 Not Implemented
BD0452 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,686 $1,310 Not Implemented
BD0452 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,291 $20 Not Implemented
BD0452 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,830 $600 Implemented
BD0452 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $2,841 $750 Not Implemented